![](https://cdn.townweb.com/townofmontrose.com/wp-content/uploads/2021/03/Mar-3-2021-ready-for-insulation-electric-work-done-scaled.jpg)
We have continued progress to report. After the teardown of the ceiling, the hall has been re-wired, and now is set for next steps, which should be insulation and sheet rocking the ceiling. The new ceiling will be about 2 feet higher than the old one, and the lighting will be dimmable LEDs.